Int 0904-2024
| * | Pierina Ana Sanchez | | Proposed Int. No. 904-A | Establishing a proactive inspection program for buildings. | Introduction | This bill would require the Department of Buildings to create a risk-based inspection program to identify hazardous buildings, using a predictive model to weigh factors including but not limited to building data, violation history, and prior façade inspection reports. The department shall conduct proactive inspections after the model assigns a risk score indicating the likelihood of a structural collapse. The owner of a building that receives a notice of violation as a result of the risk-based inspection program shall submit and post a corrective action plan within 10 days, and shall be precluded from receiving any non-emergency permits until all façade defects are corrected. Violations issued as a result of the risk-based inspection program shall be corrected within 30 days. The department shall impose escalating penalties for any violation centered on an unsafe condition that was present during the prior façade inspection program cycle. | Hearing Held by Committee | |
Action details
|
Not available
|
Int 0904-2024
| * | Pierina Ana Sanchez | | | Establishing a proactive inspection program for buildings. | Introduction | This bill would require the Department of Buildings to create a risk-based inspection program to identify hazardous buildings, using a predictive model to weigh factors including but not limited to building data, violation history, and prior façade inspection reports. The department shall conduct proactive inspections after the model assigns a risk score indicating the likelihood of a structural collapse. The owner of a building that receives a notice of violation as a result of the risk-based inspection program shall submit and post a corrective action plan within 10 days, and shall be precluded from receiving any non-emergency permits until all façade defects are corrected. Violations issued as a result of the risk-based inspection program shall be corrected within 30 days. The department shall impose escalating penalties for any violation centered on an unsafe condition that was present during the prior façade inspection program cycle. | Amendment Proposed by Comm | |
Action details
|
Not available
|
Int 0904-2024
| * | Pierina Ana Sanchez | | | Establishing a proactive inspection program for buildings. | Introduction | This bill would require the Department of Buildings to create a risk-based inspection program to identify hazardous buildings, using a predictive model to weigh factors including but not limited to building data, violation history, and prior façade inspection reports. The department shall conduct proactive inspections after the model assigns a risk score indicating the likelihood of a structural collapse. The owner of a building that receives a notice of violation as a result of the risk-based inspection program shall submit and post a corrective action plan within 10 days, and shall be precluded from receiving any non-emergency permits until all façade defects are corrected. Violations issued as a result of the risk-based inspection program shall be corrected within 30 days. The department shall impose escalating penalties for any violation centered on an unsafe condition that was present during the prior façade inspection program cycle. | Amended by Committee | |
Action details
|
Not available
|
Int 0904-2024
| * | Pierina Ana Sanchez | | | Establishing a proactive inspection program for buildings. | Introduction | This bill would require the Department of Buildings to create a risk-based inspection program to identify hazardous buildings, using a predictive model to weigh factors including but not limited to building data, violation history, and prior façade inspection reports. The department shall conduct proactive inspections after the model assigns a risk score indicating the likelihood of a structural collapse. The owner of a building that receives a notice of violation as a result of the risk-based inspection program shall submit and post a corrective action plan within 10 days, and shall be precluded from receiving any non-emergency permits until all façade defects are corrected. Violations issued as a result of the risk-based inspection program shall be corrected within 30 days. The department shall impose escalating penalties for any violation centered on an unsafe condition that was present during the prior façade inspection program cycle. | Approved by Committee | Pass |
Action details
|
Not available
|